  • 3D Modeling CD8

    3D modeling in Solid Works of the siphon refractories of the Recovery Boiler 8 (CD8) of Klabin, Monte Alegre unit.

  • Açu Port

    Delivery Centre Açu's Test Bench.

  • Auxiliary Utilities - COMPERJ

    Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,

  • Barbados - Silo Replacement

    Due to the structural compromise of the existing metallic storage silos, and as the factory operation cannot stop, this project foresees the execution of a new base for the installation of new metallic silos.

  • Cerrado Project

    Basic civil detail engineering - layout, mechanics, piping, metallic structures, instrumentation, automation, electrical and fire prevention and fighting project, for the Suzano Cerrado project - fiber line.

  • COMPERJ Building Complex

    Administrative Buildings, Restaurant, Gatehouses, Fire Fighting Truck Building, Environmental Defense Center, Warehouses, Helipad, Truck Inspection Area and the Refinery's Chilled Water Unit.

  • COMPERJ Torch Unit

    Flare Unit (Torch) of the COMPERJ UPGN.

  • Cooling Towers - COMPERJ

    Unit U-5601 (Block 1 cooling water system - 224,000 m³ / h) SE-5601 Substation (258 MW) Unit U8112-007 (scheduled stop area)

  • ETO-RCD

    Preparation of projects, supply of computerized systems, and provision of services necessary for contracting related to the implementation of the enterprise.

  • Fluid Laboratory

    Fluid Laboratory of the Tube Park

  • Gavião Preto

    Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),

  • General Engineering RJ/SP

    Umbrella project signed between Braskem and OTZ for the Provision of General Engineering Services for Business Units in the state of Rio de Janeiro

  • Ipiranga

    Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units

  • Klabin - Puma I

    Capacity Increase II Project - EUCA Line - Fiber Line - Klabin Puma I

  • Lubricant Factory

    Adequacy of the fire and panic system.

  • MSA Engineering Services

    Master service agreement for engineering services

  • RNEST (Abreu e Lima Refinery)

    Executive Engineering, 3D Modeling (PDMS) and As-built.

  • RPBC - Replacement of UCP2 Reactors

    Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.

  • Segregation TK-309

    Segregation of the existing TK-309 tank to enable its use as a storage tank for a new product.

  • Suzano Jacareí

    Basic civil engineering & layout, mechanics, piping, automation, electrical, instrumentation, for the Suzano Jacareí project # ale line plant (ASH Leaching) and MVR.

  • ULTRAGAZ

    Project for the construction of the LPG Purification Unit.

  • UO-BC

    Engineering for Campos Basin Operational Unit.

  • UPGN ROUTE III Project

    Preparation of layouts and 3D modeling of 17 process skids, considering the rigging and logistics equipment available.

  • UPGN Ruote III

    Detailing and 3D Modeling Project (E3D).

  • UTP - Açu Petróleo

    Quantitative Engineering (MTO) in addition to a Critical Analysis of the main systems of the AÇU PETROLEO Oil Treatment Unit.


Results 1 - 25 of 25
OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

www.otzengenharia.com

+55 (21) 2224-8774