Cerrado - EVAP
Civil project for “Evaporation”, in the chemical recovery area, of the largest factory in the pulp segment world.
-
Cerrado - PD (Drying)
Civil project of the Drying Area, comprising excavation projects, direct and deep foundations, dynamic analysis of equipment base, in-situ and precast concrete superstructures, metal roofing, rainwater drainage, contaminated and hydrosanitary, street...
-
Cerrado - RBPB
Civil project of the "Recovery and power boilers", in the chemical recovery area, of the largest mill in the pulp segment in the world.
-
Cerrado - WLP & GAS
Civil project for the “Caustification and Lime and Gasification Furnace”, in the chemical recovery area, of the mill factory in the pulp segment in the world.
-
Cerrado - Wood Yard
Wood yard (200,400 m²) for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.
-
COMPERJ - Route 3
Rota 3 natural gas processing unit.
-
COMPERJ Building Complex
Administrative Buildings, Restaurant, Gatehouses, Fire Fighting Truck Building, Environmental Defense Center, Warehouses, Helipad, Truck Inspection Area and the Refinery's Chilled Water Unit.
-
Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)
12 bridges with widths of 3.3m, 6.35m, and 10.22m, totaling an extension of 128.25 meters to span spans of 8m, 8.40m, 8.50m, 8.82m, 9m, 9.90m, 10m, 10.20m, 10.5m, 10.90m, 11.96m, and 22.6m.
-
Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)
Metal bridge for crossing the Main Flare line (ø = 54”), the Chemical Flare (ø = 12”), and its utilities, to span 34 meters.
-
Fazenda Solar Project (Allotment)
Photovoltaic project of 610.000KWh.
-
FL - Capacity Increase II
Increase in Capacity 2 of the Fiber Line of Klabin's PUMA 1 project, located in the municipality of Ortigueira, PR.
-
Fluid Laboratory
Fluid Laboratory of the Tube Park
-
Gavião Preto
Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),
-
General Engineering RJ/SP
Umbrella project signed between Braskem and OTZ for the Provision of General Engineering Services for Business Units in the state of Rio de Janeiro
-
Implementation of the Ilha Comprida Waterway Terminal
Implementation of the Ilha Comprida Waterway Terminal: Support Pier, Service Ramp, Ball Base, Tank Base (including wall for containment basin), Pipe-Rack, Substation, and Administrative Building.
-
Industrial Waste Treatment Station (ETDI) - Imboassica
Characterization of the waste generated, currently packed in sealed concrete boxes, for washing and cleaning parts contaminated with oil and chemicals.
-
Ipiranga
Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units
-
Jacareí - ASH and MVR
Civil project to modernize the “ASH Leaching and MVR”, in the chemical recovery area, at the Jacareí factory in the pulp segment, with an investment of 2 billion reais.
-
Jacareí - Fiber Line
Modernization of the C Fiber Line at the Suzano plant in Jacareí/SP.
-
Linde Gases Factory
Construction of the new Linde Gases unit in Santa Cruz (Industrial Zone), RJ.
-
Linde Gases Factory - Resende
Construction of the new Linde Gases unit - Resende, RJ
-
MSA Engineering Services
Master service agreement for engineering services
-
PERENCO - Rainwater Drainage
Contracting Process for Electromechanical Assembly of the Pluvial Drainage Systems of the Platforms of Campos de Vermelho (PVM-1/2/3), Carapebas (PCP-1/2/3) and Pargo (PPG-1).
-
REDUC (Duque de Caxias Refinery)
Hydrodesulfurization Unit (HDS), Hydrogen Generation Unit (UGH), and Substation.
-
RNEST (Abreu e Lima Refinery)
Executive Engineering, 3D Modeling (PDMS) and As-built.
- 1