  • Açu Port

    Delivery Centre Açu's Test Bench.

  • Auxiliary Utilities - COMPERJ

    Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,

  • Cerrado - PD (Drying)

    Civil project of the Drying Area, comprising excavation projects, direct and deep foundations, dynamic analysis of equipment base, in-situ and precast concrete superstructures, metal roofing, rainwater drainage, contaminated and hydrosanitary, street...

  • ETO-RCD

    Preparation of projects, supply of computerized systems, and provision of services necessary for contracting related to the implementation of the enterprise.

  • Fazenda Solar Project (Allotment)

    Photovoltaic project of 610.000KWh.

  • Gavião Preto

    Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),

  • General Engineering RJ/SP

    Umbrella project signed between Braskem and OTZ for the Provision of General Engineering Services for Business Units in the state of Rio de Janeiro

  • Inhaúma Shipyard

    Renovation and adaptation of a 2-story building for office occupation.

  • MSA Engineering Services

    Master service agreement for engineering services

  • PERENCO - Adequacy of Drainage System

    Adequacy of the rainwater drainage systems of the Campos de Vermelho (PVM-1 and 3) and Carapebas (PCP-2) platforms.

  • Replicating FPSOs

    Engineering Project for Petrobras FPSOs - P-68 and P-70.

  • Road Bridge - Dam

    Bridge with a length of 1.3 km and a width of 10.80 m over the reservoir of the De Mascarenhas De Moraes Hydroelectric Power Plant, which will integrate the MG-856 highway.

  • ULTRAGAZ

    Project for the construction of the LPG Purification Unit.

  • UO-BC

    Engineering for Campos Basin Operational Unit.

  • Waterway Terminal of Guanabara Bay

    Modernization of the terminal with the construction of New Dolphins to support ship mooring loads of up to 25,000TPB with a maximum traction force of 1,000kN...

  • Wood Group

    Engineering for projects.


Results 1 - 16 of 16
OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

www.otzengenharia.com

+55 (21) 2224-8774