As-Built Flowcharts
Elaboration of “as-built” engineering flowcharts for PCP1, PCP3, PVM1 and PVM2 platforms.
-
Auxiliary Utilities - COMPERJ
Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,
-
COMPERJ - Route 3
Rota 3 natural gas processing unit.
-
COMPERJ Building Complex
Administrative Buildings, Restaurant, Gatehouses, Fire Fighting Truck Building, Environmental Defense Center, Warehouses, Helipad, Truck Inspection Area and the Refinery's Chilled Water Unit.
-
COMPERJ Torch Unit
Flare Unit (Torch) of the COMPERJ UPGN.
-
Consulting Services
To analyze the feasibility of implementations of offshore wind energy generation projects in Brazil.
-
Cooling Towers - COMPERJ
Unit U-5601 (Block 1 cooling water system - 224,000 m³ / h) SE-5601 Substation (258 MW) Unit U8112-007 (scheduled stop area)
-
Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)
12 bridges with widths of 3.3m, 6.35m, and 10.22m, totaling an extension of 128.25 meters to span spans of 8m, 8.40m, 8.50m, 8.82m, 9m, 9.90m, 10m, 10.20m, 10.5m, 10.90m, 11.96m, and 22.6m.
-
Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)
Metal bridge for crossing the Main Flare line (ø = 54”), the Chemical Flare (ø = 12”), and its utilities, to span 34 meters.
-
Fluid Laboratory
Fluid Laboratory of the Tube Park
-
FPSO Cidade Maricá
FPSO Cidade Maricá
-
Gavião Preto
Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),
-
GRANIHC
Provide customer support in the engineering detail project, implement As-Built in the documentation and 3D Model and technical support for the works on the P-68 Platform.
-
Imboassica Pipe Park
Internal and external renovation of administrative buildings 501 and 502.
-
Implementation of the Ilha Comprida Waterway Terminal
Implementation of the Ilha Comprida Waterway Terminal: Support Pier, Service Ramp, Ball Base, Tank Base (including wall for containment basin), Pipe-Rack, Substation, and Administrative Building.
-
Industrial Waste Treatment Station (ETDI) - Imboassica
Characterization of the waste generated, currently packed in sealed concrete boxes, for washing and cleaning parts contaminated with oil and chemicals.
-
Inhaúma Shipyard
Renovation and adaptation of a 2-story building for office occupation.
-
Ipiranga
Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units
-
Linde Gases Factory
Construction of the new Linde Gases unit in Santa Cruz (Industrial Zone), RJ.
-
Linde Gases Factory - Resende
Construction of the new Linde Gases unit - Resende, RJ
-
Lubricant Factory
Adequacy of the fire and panic system.
-
Modules 2, 3 and 7 of the P 75 and P77 (FPSO)
FPSO - Oil production = 24,000 m³/day. Module 2 - CO² Compression Module 3 - Export Gas Compression Module 7 - Injection Gas
-
Modules for P-75 and P-77
FPSO - Oil production = 24,000 m³/day. Module 6 - Gas Dehydration Module 8 - H2S Removal Module 14 - Chemicals
-
MSA Engineering Services
Master service agreement for engineering services
-
New Helideck
The P-53 is an FPU that was installed in October 2008 in the Marlim Leste field, and since then, due to the relative position between the houses and the helipad...