Idioma | Language


  • Cerrado - EVAP

    Civil project for “Evaporation”, in the chemical recovery area, of the largest factory in the pulp segment world.

  • Cerrado - Fiber Line

    Fiber Line for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.

  • Cerrado - PD (Drying)

    Civil project of the Drying Area, comprising excavation projects, direct and deep foundations, dynamic analysis of equipment base, in-situ and precast concrete superstructures, metal roofing, rainwater drainage, contaminated and hydrosanitary, street...

  • Cerrado - RBPB

    Civil project of the "Recovery and power boilers", in the chemical recovery area, of the largest mill in the pulp segment in the world.

  • Cerrado - WLP & GAS

    Civil project for the “Caustification and Lime and Gasification Furnace”, in the chemical recovery area, of the mill factory in the pulp segment in the world.

  • Cerrado - Wood Yard

    Wood yard (200,400 m²) for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.

  • COMPERJ - Route 3

    Rota 3 natural gas processing unit.

  • Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)

    12 bridges with widths of 3.3m, 6.35m, and 10.22m, totaling an extension of 128.25 meters to span spans of 8m, 8.40m, 8.50m, 8.82m, 9m, 9.90m, 10m, 10.20m, 10.5m, 10.90m, 11.96m, and 22.6m.

  • FL - Capacity Increase II

    Increase in Capacity 2 of the Fiber Line of Klabin's PUMA 1 project, located in the municipality of Ortigueira, PR.

  • Gavião Preto

    Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),

  • Ipiranga

    Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units

  • Jacareí - ASH and MVR

    Civil project to modernize the “ASH Leaching and MVR”, in the chemical recovery area, at the Jacareí factory in the pulp segment, with an investment of 2 billion reais.

  • Jacareí - Fiber Line

    Modernization of the C Fiber Line at the Suzano plant in Jacareí/SP.

  • Lubricant Factory

    Adequacy of the fire and panic system.

  • MSA Engineering Services

    Master service agreement for engineering services

  • Road Bridge - Dam

    Bridge with a length of 1.3 km and a width of 10.80 m over the reservoir of the De Mascarenhas De Moraes Hydroelectric Power Plant, which will integrate the MG-856 highway.

  • RPBC - Replacement of UCP2 Reactors

    Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.

  • VERTERE

    New Pulp and Retro-Area warehouse in the Port of Santos.


Results 1 - 18 of 18
OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

www.otzengenharia.com

+55 (21) 2224-8774