-
Cerrado - EVAP
Civil project for “Evaporation”, in the chemical recovery area, of the largest factory in the pulp segment world.
-
Cerrado - Fiber Line
Fiber Line for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.
-
Cerrado - PD (Drying)
Civil project of the Drying Area, comprising excavation projects, direct and deep foundations, dynamic analysis of equipment base, in-situ and precast concrete superstructures, metal roofing, rainwater drainage, contaminated and hydrosanitary, street...
-
Cerrado - RBPB
Civil project of the "Recovery and power boilers", in the chemical recovery area, of the largest mill in the pulp segment in the world.
-
Cerrado - WLP & GAS
Civil project for the “Caustification and Lime and Gasification Furnace”, in the chemical recovery area, of the mill factory in the pulp segment in the world.
-
Cerrado - Wood Yard
Wood yard (200,400 m²) for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.
-
COMPERJ Building Complex
Administrative Buildings, Restaurant, Gatehouses, Fire Fighting Truck Building, Environmental Defense Center, Warehouses, Helipad, Truck Inspection Area and the Refinery's Chilled Water Unit.
-
Cooling Towers - COMPERJ
Unit U-5601 (Block 1 cooling water system - 224,000 m³ / h) SE-5601 Substation (258 MW) Unit U8112-007 (scheduled stop area)
-
FL - Capacity Increase II
Increase in Capacity 2 of the Fiber Line of Klabin's PUMA 1 project, located in the municipality of Ortigueira, PR.
-
Gavião Preto
Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),
-
Imboassica Pipe Park
Internal and external renovation of administrative buildings 501 and 502.
-
Implementation of the Ilha Comprida Waterway Terminal
Implementation of the Ilha Comprida Waterway Terminal: Support Pier, Service Ramp, Ball Base, Tank Base (including wall for containment basin), Pipe-Rack, Substation, and Administrative Building.
-
Inhaúma Shipyard
Renovation and adaptation of a 2-story building for office occupation.
-
Ipiranga
Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units
-
Jacareí - ASH and MVR
Civil project to modernize the “ASH Leaching and MVR”, in the chemical recovery area, at the Jacareí factory in the pulp segment, with an investment of 2 billion reais.
-
Jacareí - Fiber Line
Modernization of the C Fiber Line at the Suzano plant in Jacareí/SP.
-
Linde Gases Factory
Construction of the new Linde Gases unit in Santa Cruz (Industrial Zone), RJ.
-
Linde Gases Factory - Resende
Construction of the new Linde Gases unit - Resende, RJ
-
MSA Engineering Services
Master service agreement for engineering services
-
REDUC (Duque de Caxias Refinery)
Hydrodesulfurization Unit (HDS), Hydrogen Generation Unit (UGH), and Substation.
-
RNEST (Abreu e Lima Refinery)
Executive Engineering, 3D Modeling (PDMS) and As-built.
-
RPBC - Replacement of UCP2 Reactors
Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.
-
UO-BC
Engineering for Campos Basin Operational Unit.
-
VERTERE
New Pulp and Retro-Area warehouse in the Port of Santos.
-
WTP - Imbetiba
Water Treatment Station at Petrobras' Imbetiba Base.