Road Bridge - Dam
Bridge with a length of 1.3 km and a width of 10.80 m over the reservoir of the De Mascarenhas De Moraes Hydroelectric Power Plant, which will integrate the MG-856 highway.
-
RPBC - Replacement of UCP2 Reactors
Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.
-
Sanitary Network B. Roxo
Construction of 3,500 m of Sewage Network with a DN 150mm pipe laying, for the implementation of a Sanitary Sewage System in the Municipality of Belford Roxo.
-
UTP - Açu Petróleo
Quantitative Engineering (MTO) in addition to a Critical Analysis of the main systems of the AÇU PETROLEO Oil Treatment Unit.
-
VERTERE
New Pulp and Retro-Area warehouse in the Port of Santos.
-
WTP - Imbetiba
Water Treatment Station at Petrobras' Imbetiba Base.