MSA Engineering Services
Master service agreement for engineering services
-
Photovoltaic Power Project
Photovoltaic enterprise of 80 MW.
-
Railway Works - Bridges
8 bridges, six railway bridges and two road bridges from the EMT-01 to EMT-05 section of the Transnordestina Railway.
-
REDUC (Duque de Caxias Refinery)
Hydrodesulfurization Unit (HDS), Hydrogen Generation Unit (UGH), and Substation.
-
REVAMP TEBIG (Maritime Terminal)
Renovation and modernization of operating platform installations and systems with replacement and inclusion of equipment.
-
RNEST (Abreu e Lima Refinery)
Executive Engineering, 3D Modeling (PDMS) and As-built.
-
Road Bridge - Dam
Bridge with a length of 1.3 km and a width of 10.80 m over the reservoir of the De Mascarenhas De Moraes Hydroelectric Power Plant, which will integrate the MG-856 highway.
-
RPBC - Replacement of UCP2 Reactors
Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.
-
Segregation TK-309
Segregation of the existing TK-309 tank to enable its use as a storage tank for a new product.
-
Tesália Paulistana Wind Power Project
Wind Power Station 200 MW
-
UFV Nova Cruz Project
Photovoltaic enterprise of 30 MW.
-
UTP - Açu Petróleo
Quantitative Engineering (MTO) in addition to a Critical Analysis of the main systems of the AÇU PETROLEO Oil Treatment Unit.
-
VERTERE
New Pulp and Retro-Area warehouse in the Port of Santos.
-
Waterway Terminal of Guanabara Bay
Modernization of the terminal with the construction of New Dolphins to support ship mooring loads of up to 25,000TPB with a maximum traction force of 1,000kN...
-
WTP - Imbetiba
Water Treatment Station at Petrobras' Imbetiba Base.